PUBLIC DELIVERY PLAN

Beta ends at a gate,
not a marketing date.

HoodFlow will remove the Mainnet Beta label only after every security and operations gate below is complete and publicly verifiable.

3 / 7EXIT GATES COMPLETE

No promised date · status changes require evidence
01
Live

Direct execution

Automatic V3/V4 quotes, minimum output and exact short-lived permissions for 14 currently reviewed routes.

02
Live

Wallet onboarding

Privy social login, embedded wallets, browser wallets and WalletConnect on Robinhood Chain.

03
Live

Portfolio & transparency

Onchain balances, honest local cost basis, fee disclosure, market hours and controller visibility.

04
In progress

Independent audit

Publish an independent smart-contract and interface assessment with a public remediation log.

05
In progress

Multisig + timelock

Move engine administration away from the current single owner wallet and verify the policy onchain.

06
In progress

Production RPC redundancy

Operate at least two authenticated production providers with measured failover and incident alerts.

07
In progress

DCA operating history

Complete monitored canary volume, keeper reliability targets and an incident-response drill.

THE RULE

No audit badge before an audit.
No multisig claim before the owner changes.
No “ready” status without a live route.

Review current security state →